Construction Progress Monitoring (CPM) is a significant aspect of project management aimed to align planned design with the actual construction on site, the process ensures that the project is well within the control of the stakeholders involved and ensures the project is completed complying with the construction documents, on time, and within budget. Despite how central progress monitoring is to attaining project success and advances in technology, the progress monitoring is majorly implemented manually, which requires manual retrieving and processing of site data to compare with the planned design. This manual process is both time-consuming and prone to errors. Automating the task of progress monitoring involving real-time data acquisition and timely information retrieval can assist the project managers for effective decision making to the successful delivery of the project. Thus, the objective of this research was to assess the impact of computer vision (CV) – based progress monitoring as a driver for effective decision-making in project management. A qualitative methodology was implemented for this research using Preferred Reporting Items for Systematic Reviews and Meta-Analyses (PRISMA) to review and analyze studies on the application of computer vision (CV). The study reviews studies of CV based CPM process, highlighting its benefits against the traditional method of progress and the limitation to its adoption. Research findings from this paper provide an increased understanding and have a broader scope on the application of computer vision-based progress monitoring
The University of Texas at San Antonio, United States - ORCID: 0000-0001-8168-7438
The University of Texas at San Antonio, United States
Titolo del capitolo
A Review of Computer Vision-Based Progress Monitoring for Effective Decision Making
Autori
Roy Lan, Tulio Sulbaran
DOI
10.36253/979-12-215-0289-3.85
Opera sottoposta a peer review
Anno di pubblicazione
2023
Copyright
© 2023 Author(s)
Licenza d'uso
Licenza dei metadati
Titolo del libro
CONVR 2023 - Proceedings of the 23rd International Conference on Construction Applications of Virtual Reality
Sottotitolo del libro
Managing the Digital Transformation of Construction Industry
Curatori
Pietro Capone, Vito Getuli, Farzad Pour Rahimian, Nashwan Dawood, Alessandro Bruttini, Tommaso Sorbi
Opera sottoposta a peer review
Anno di pubblicazione
2023
Copyright
© 2023 Author(s)
Licenza d'uso
Licenza dei metadati
Editore
Firenze University Press
DOI
10.36253/979-12-215-0289-3
eISBN (pdf)
979-12-215-0289-3
eISBN (xml)
979-12-215-0257-2
Collana
Proceedings e report
ISSN della collana
2704-601X
e-ISSN della collana
2704-5846